Product

TTR capacity visibility

See annual, rolling, residual, and ad-hoc bands across a 36-month horizon. Filter by year, corridor, and infrastructure manager — before you commit to a path.

Four band types

Annual paths for stable flows, rolling windows for seasonal adjustments, residual slots for opportunistic moves, and ad-hoc for urgent requests. Each band type maps to TTR booking rules.

36-month calendar view

The capacity calendar shows utilization heatmaps per corridor month. Spot bottlenecks before they block your train plan.

Booking-window validation

The TTR validator checks whether a requested slot falls inside the correct booking window for its band type — reducing rejected path requests.